Coastal NC marine construction portfolio

PORTFOLIO · WHERE QUALITY MEETS THE WATER LINE

Coastal NC Dock & Pier Portfolio

Real projects from real waterfronts — Hampstead to Sneads Ferry.

11 Services8 Cities30+ Years ConstructionFamily-Owned

RECENT PROJECTS

Recent builds from our crew

Filter by service to see floating docks, fixed piers, boat lifts, gazebos, custom docks, and waterfront decks — every photo is a real Intracoastal Installs project.

Additional project photography will be added as builds complete. All photos are real Intracoastal Installs builds.

FROM THE FOUNDER

Every dock in this portfolio is still standing — and most of them have a story behind them.

— Mark Lipe

FAQ

Questions homeowners ask after browsing

Are these all real projects you built?

Yes. Every photo in this portfolio is a real Intracoastal Installs build on a real coastal NC waterfront — Hampstead, Wilmington, Topsail Beach, Wrightsville Beach, Carolina Beach, Surf City, Sneads Ferry, or Figure Eight Island. No stock photography, no AI compositing, no projects from other builders.

Can I get a dock that looks like one of these?

Almost certainly. Most of the docks you see here are variations on the same coastal-grade build standard: marine-grade pressure-treated framing, 316 stainless fasteners, hot-dipped galvanized hardware, and pilings driven to refusal. Roof style, decking material (composite, IPE, or pressure-treated), gangway, and boat lift are all selectable. Tell us which photo you like and we will price a build that fits your bulkhead and budget.

How long does a build like these take?

From signed contract to final walkthrough, most coastal NC docks take 4–10 weeks. CAMA general permits (Pender, New Hanover, Onslow) typically clear in 2–4 weeks. Build time on site is usually 2–4 weeks depending on size, roof, and lift. Storm-damage repair work moves faster — we run a same-week response for repeat clients.

What does a dock like one of these cost?

Every dock in this portfolio was priced from a site visit, not a chart — length, water depth, materials, roof, and lift all move the number. Tell us which photo you like and we will walk your shoreline for free and send a written estimate within one business day with every board, fastener, and piling listed. See what drives dock cost for the factors that matter most.

Do you build in my city?

If you are on the water between Sneads Ferry and Carolina Beach, yes — our service area is 8 coastal NC cities across 3 counties (Pender, New Hanover, Onslow) where we file CAMA general permits in-house. We also build freshwater-lake docks inland within reach of our Hampstead shop; lake projects usually skip CAMA entirely.

Like what you see?

Let us build something like this for your waterfront. Free site evaluation.