Fixed Piers in Surf City, NC

FIXED PIERS · SURF CITY, NC

Fixed Piers in Surf City, NC

Hurricane-rated pier construction for the Cape Fear River, ICW, and Topsail Sound — plus freshwater-lake piers inland, all built on pressure-treated pilings driven to refusal. Based in Hampstead, within easy reach of the Surf City waterfront.

Hurricane-RatedPressure-Treated Pilings30+ Years ConstructionPender / Onslow County

QUICK ANSWER

Who builds fixed piers in Surf City, NC?
Intracoastal Installs builds fixed piers in Surf City, NC. We are a family-owned, fully insured marine contractor based at 312 Olde Point Loop, Hampstead. Call (910) 612-6107 for a free Surf City site visit.

SURF CITY CONDITIONS

Why Surf City fixed piers are different

Surf City sits across two counties — north of the swing bridge is Onslow, south is Pender. We file the right permit on the right side every time.

County boundary runs through town — dual permitting reach
Topsail Sound and Stump Sound — both sound-side waters
Heavy floating-dock demand for shallow-draft homes

EVERY FIXED PIERS BUILD COVERS

What is included

  • CAMA permit-aware piling layout
  • Pressure-treated 8x8 or 10x10 pilings driven to refusal
  • Marine-grade lumber decking, stringers, and railings
  • 316 stainless lag bolts and through-bolts
  • Optional T-head, L-head, or covered roof structure

SURF CITY COVERAGE MAP

We work the entire Surf City waterfront

SURF CITY AT A GLANCE

County
Pender / Onslow County
Service
Fixed Piers
Permits
Pender / Onslow County CAMA
Typical timeline
3–14 days
Insurance
Fully insured
Book Surf City site visit

FAQ

Fixed Piers in Surf City, NC — questions answered

Do you build fixed piers in Surf City, NC?

Yes. We build fixed piers throughout Surf City and the surrounding Pender / Onslow County area. Our shop is at 312 Olde Point Loop in Hampstead, NC — a short drive to every Surf City bulkhead. Call (910) 612-6107 for a free site visit.

What does a fixed piers cost in Surf City, NC?

Free site evaluation. Most residential fixed piers fall in the $18,000 – $60,000 range depending on length and head shape, plus permits. Permit cost varies by Pender / Onslow County CAMA review. We provide a written, itemized estimate within one business day.

Do you handle CAMA permits for Surf City projects?

Yes. Surf City falls under Pender / Onslow County CAMA general permits, and we walk every application through with you. Most Surf City sound-side homes do better with a floating dock — the shallow draft and tide swing fight a fixed pier.

How deep do you drive pilings?

We drive every piling to refusal — usually 12 to 20 feet depending on the bottom. We do not stop short to save time.

Will my pier survive a hurricane?

No builder can promise a pier will survive every storm, and you should be wary of one who does. What we can promise is the engineering standard: every piling driven to refusal, 316 stainless hardware on every saltwater connection, and roof framing sized for the local wind zone. Those three things are what separate the piers that ride out a hurricane from the ones that do not.

Free Surf City fixed piers estimate

We will visit your Surf City bulkhead, walk the shoreline, and provide a written, itemized estimate within one business day.