Fixed Piers in Surf City, NC

FIXED PIERS · SURF CITY, NC

Fixed Piers in Surf City, NC

Hurricane-rated pier construction for the Cape Fear River, ICW, and Topsail Sound — plus freshwater-lake piers inland, all built on pressure-treated pilings driven to refusal. Based ten minutes from the Surf City waterfront.

Hurricane-RatedPressure-Treated Pilings30+ Years ConstructionPender / Onslow County

QUICK ANSWER

Who builds fixed piers in Surf City, NC?
Intracoastal Installs builds fixed piers in Surf City, NC. We are a family-owned, nc gc #100980 marine contractor based 312 Olde Point Loop, Hampstead. Call (910) 612-6107 for a free Surf City site visit.

SURF CITY CONDITIONS

Why Surf City fixed piers are different

Surf City sits across two counties — north of the swing bridge is Onslow, south is Pender. We file the right permit on the right side every time.

County boundary runs through town — dual permitting reach
Topsail Sound and Stump Sound — both sound-side waters
Heavy floating-dock demand for shallow-draft homes

EVERY FIXED PIERS BUILD COVERS

What is included

  • CAMA permit-aware piling layout
  • Pressure-treated 8x8 or 10x10 pilings driven to refusal
  • Marine-grade lumber decking, stringers, and railings
  • 316 stainless lag bolts and through-bolts
  • Optional T-head, L-head, or covered roof structure

SURF CITY COVERAGE MAP

We work the entire Surf City waterfront

FAQ

Fixed Piers in Surf City, NC — questions answered

>

Do you build fixed piers in Surf City, NC?

Yes. We build fixed piers throughout Surf City and the surrounding Pender / Onslow County area. Our shop is at 312 Olde Point Loop in Hampstead, NC — a short drive to every Surf City bulkhead. Call (910) 612-6107 for a free site visit.
>

What does a fixed piers cost in Surf City, NC?

Free site evaluation. Most residential fixed piers fall in the $18,000 – $60,000 range depending on length and head shape, plus permits. Permit cost varies by Pender / Onslow County CAMA review. We provide a written, itemized estimate within one business day.
>

Do you handle CAMA permits for Surf City projects?

Yes. Surf City falls under Pender / Onslow County CAMA general permits, and we walk every application through with you. Most Surf City sound-side homes do better with a floating dock — the shallow draft and tide swing fight a fixed pier.
>

How deep do you drive pilings?

We drive every piling to refusal — usually 12 to 20 feet depending on the bottom. We do not stop short to save time.
>

Will my pier survive a hurricane?

A pier built to refusal with stainless hardware and a properly engineered roof will survive a direct Category 2 hit. Florence took out hundreds of piers in 2018; ours stayed.

Free Surf City fixed piers estimate

We will visit your Surf City bulkhead, walk the shoreline, and provide a written, itemized estimate within one business day.